Policy schedules inherit errors: stated areas, construction details, protection features and exposure assumptions that no longer describe the building. This pack documents the corrections so your broker can put them to the insurer.
Areas, volumes and construction recorded from the measured building, not the last schedule.
Sprinklers, separation, alarms and access control documented as installed.
Corrections framed for underwriting review, with the evidence attached.
Extensions, subdivisions, part-vacancy and refurbishment all leave schedules behind. Cautious assumptions cost premium; missing detail costs at claim time. Both are correctable with evidence.
Send the policy schedule. We flag the entries worth correcting and what each is likely doing to the premium.